fireplace: complete

as you probably guessed from the last post, we have been working on tiling the rest of the fireplace. we were planning on waiting a little while to start the next project, but we were so so close to being completely finished with the dining room/living room. and then we found the perfect fireplace grate. and then my mom came to visit and wanted to help with a project...

as a reminder, this is what we started with:
DSC_0794

the fireplace is obviously non-functioning, but is still a focal point of our dining room. the bricks were not in the best condition and the floor tile was falling apart. when we decided to install the new hardwood floor, we started to also think about what we could do to the fireplace.

we ended up using 8"x24" carrara marble tiles for the hearth and installed the tiles when we worked on the hardwood floor.

DSC_0835

DSC_0849

we then we simply re-installed the mantel and left it at that.

a couple of months ago, while at our favorite local architectural salvage, we found the perfect fireplace grate. even better, it was a really good price. most of the antique grates that i had found were very ornate (and expensive - most were $300+). i was looking for something more simple so when i found one, and then saw the price tag ($75), i quickly bought it.

in order to install the grate we needed to tile around the rest of the fireplace.

first we built a frame for the backerboard and included a recessed area for the grate. attaching the studs to the crumbling brick was difficult.

DSC_1062
next we installed the backerboard and a couple of pieces of scrap wood so that we could later install finish wood pieces on the sides. for some reason the sides of the mantel were hollow and we wanted to box them in so we could have a finished edge for the tile.

DSC_1063

next was the fun part - tiling!!

DSC_1070

i wanted to use the same cararra marble that we used on the floor, only in a smaller format. i was really excited when i found these 2"x8" tiles. first we installed the sides, and then had to wait a week before installing the rest. you can see how we were laying everything out first in the photo above. some of the tiles were more gray and i wanted to make sure they were evenly mixed in.

DSC_1073
to bridge the gap over the area where the grate would go, we had to add a temporary support piece to hold up the tiles while they dried. looks a little strange, but it worked.

a few days later, i painted the recessed area black, we sealed the marble, and then we grouted.

DSC_1077

we cut and stained 2 pieces of oak to close off the ends of the mantel. finally, we installed the antique grate. the grate was a little tricky because it actually is 2 pieces. we were able to hold the frame portion in place with some wire and screws, and then slide the grate right in.

DSC_1082

final result - i love it. it is exactly what i was hoping for. we left the grate in the same condition as we bought it, so it is not perfect. i really like how the grate and the dark mantel look with the bright tile and the clean lines. i wanted something that was more modern but still went with the style of our house, and i think that the mix of the antique pieces with the format of the tile is a great combination.

DSC_1085

and as soon as i clean the dining room, i'll make sure to take a few pictures so that you can see how the fireplaces fits in to the entire room.

10 Comments

misc.

- in between lots of work (me) and rugby (mike) we've been doing some of this:

cardsgame1
followed by some of this:
cardsgame2
2 cardinal games in 2 weeks! and they won both games! (sorry for the iphone pics)

- oh, yeah - i finally got an iphone. and i already don't know how i lived so long without it.

- mike won tickets to a concert through work... what concert you ask? only the greatest concert ever! we're going to BON JOVI on sunday. i.can.not.wait!!

- our house turns 100 this year, and we've decided to throw our house a party. plus we said that we would have our house warming party after we fixed the floors... and that was 3 years ago. we're working on the details for the party, but i'm looking forward to spending time with our friends enjoying the house.

- even though we've been really busy, we've managed to find some time to work on a project. here's a preview, the rest of the pictures coming soon..
DSC_1061

2 Comments

trouble

trouble - also known as trevi:
DSC_0001

i've written about our cat trevi before. don't let his innocent look in the picture trick you, he's always up to something...

i had to work late tonight, but mike made sure to call me with the latest trouble/trevi story. today, while we were at work, cooper and trevi decided to join forces.

DSC_0936

sometimes we will gate cooper upstairs when we are gone during the day. today was one of those days. for whatever reason, cooper is really afraid of the baby gate. this is important to know because he would never try to jump the gate or anything like that. when we gate him in an area, he stays there.

today, cooper ate a loaf of bread.

a loaf of bread that was on top of the refrigerator when we left for work this morning. downstairs on the refrigerator.

are you following this? dog upstairs, bread downstairs, scary gate between.


trevi kind of really likes things in bags. specifially food in crinkly bags. i'm 100% sure that trevi got on top of the fridge, started playing with the loaf of bread, eventually carried it up the stairs, under the babygate, and gave it to cooper.

i can't really blame cooper for eating it, esp. after trevi went through all of the trouble of bringing it to him....

4 Comments

california

mike and i had decided that instead of buying each other presents for christmas last year, we would take a long weekend trip. we looked into a few options, but quickly decided that we wanted to go to california. san francisco to be exact. my uncle lives there, we thought we would have a great time visiting him and seeing all of the sites. i had gone on a similar trip with my mom and grandma a few years ago, but mike had never been and i knew he would love it.

we went a few weeks ago and had a fantastic time. i knew that we'd have fun, but i was impressed with how much we were able to do/see in only 3.5 days, and yet i still felt like we had a relaxing trip.

we flew in on friday afternoon, which was nice because we had some time on friday to enjoy dinner at my uncle's house and relax after our flight.

on saturday we walked around palo alto and stanford's campus before going into the city for dinner. there is something about the energy on a college campus that i just love.
DSC_0970

DSC_0971

DSC_0968

on sunday we drove up to sonoma for a day/night and were able to take a tour at one of the wineries. i'd never been on a tour before and thought it was so interesting and made me appreciate the wine even more.

DSC_0982
monday morning we had a quick drive around downtown sonoma before heading back to san francisco.

DSC_0988

but of course we got distracted by a few more wineries along the way. the views were so beautiful, it was hard not to stop!

DSC_1011
mike looks extra tall in this photo. or maybe i just look extra short.

DSC_0990
once back in san fran, we stopped at the golden gate bridge.

DSC_1032

DSC_1016

and took a boat out to alcatraz to take a tour.

DSC_1038

we did the audio walking tour of alcatraz and we were both super impressed with the tour.

DSC_1060

i didn't get a picture, but we also made sure to drive past the full house house before leaving the city. we're such tourists :-)

our plane left on tuesday morning and we were sad to leave, we had such a great time. i can't wait to go back!

4 Comments

bathroom budget

surprisingly, our bathroom ended up coming in under budget! that never happens, so i thought that i'd share the breakdown with you. plus i like to have these things to reference later. per usual, we were on a tight budget (even more so since this project just sort of evolved from the original floor project). i was hoping to stay under $1k for the entire half bathroom remodel. and here's how we did:

toilet - kohler brand from lowes = $129
sink - american standard brand from lowes = $84
paint - quart of valspar, let me know if you want the color name and i'll look = $13
lights - alabax ceiling and truman sconce, from school house electric = $255
toilet paper holder - grundtal from ikea = $5
towel hook - blecka from ikea = $5
baseboards - from lowes = $26
mirror - made by us, glass and trim from lowes = $28
faucet - from overstock = $150
hardwood floor - ordered with the rest of our flooring, approx = $30
misc. plumbing parts - lowes, approx. = $25

grand total = $750

you can tell where my priorities are... light fixtures and faucets. we already had the trim paint, stain, poly, supplies to finish door, etc. the only other thing that we've bought for the bathroom is the poster. i saw this poster on door sixteen and followed the link to pop chart lab. i really liked the graphics of this poster and thought it would be a fun addition to the bathroom. DSC_0927
as i mentioned in the last post, i'm still looking for a few other bathroom accessories, but i am happy that the renovation portion is complete and that we were able to stick to our budget.

so what have we been doing since we finished with these two big projects? well, a lot of this:
DSC_0925
(that's my spot down at the end between cooper and trevi)

and... we also took a vacation! pictures coming soon...

4 Comments

search

Swedish Greys - a WordPress theme from Nordic Themepark. Converted by LiteThemes.com.